Construction study for the repair and arrangement of a nursery school in Nea Ionia.
Location: Nea Ionia, Attica
Surface: 641 s.m.
Supervision: 2021-2022
Client: Municipality of Nea Ionia
Surface: 641 s.m.
Supervision: 2021-2022
Client: Municipality of Nea Ionia
Object of the study was the repair and arrangment of the existing building of the nursery school, owned by the Municipality of Nea Ionia.