-
Pre-stressed - Cantilevered Road Gorge Bridge in Tzoumerka
-
Construction of New 120 beds General Hospital, in Leykada
-
Structural adequacy and retrofitting Design of Pipe-Racks U-1100 & U-3100
-
Pre-stressed - Road Gorge Bridge in Tzoumerka
-
Administration and Health Service Building of the Social Insurance Institute (IKA – ETAM), in Pyrgos
-
Structural adequacy of FCC/D steel structure for the implementation of the Ε-3314 alternator
-
Restoration of Byzantine masonry bridge
-
Rearrangement & Supplementing Design of Piraeus Building for the TEI of Athens
-
Retaining Design of V-3501 B container
-
Reconstruction Design for the Administrator's Square, in Thessaloniki