Χ. ΜΑΡΑΒΕΑΣ ΚΑΙ ΣΥΝΕΡΓΑΤΕΣ Ε.Ε.
  • HOME PAGE
  • ABOUT
  • SERVICES
  • PROJECTS
  • NEWS
  • SITEMAP
  • CONTACT US
  • GR
  • |
  • EN
  • Structural Engineering
    • Building Projects
    • Industrial
    • Bridges
    • Tunnels and Cut & Cover
  • Architectural Design
Structural Engineering
  • 3 Min Pre-stressed - Cantilevered Road Gorge Bridge in Tzoumerka
  • 1 Min Rearrangement & Supplementing Design of Piraeus Building for the TEI of Athens
  • Img 2040 Structural adequacy and retrofitting Design of Pipe-Racks U-1100 & U-3100
  • Br10 Pre-stressed - Road Gorge Bridge in Tzoumerka
  • Camera3 Min Reconstruction Design for the Administrator's Square, in Thessaloniki
  • Pict0196 Min Structural adequacy of FCC/D steel structure for the implementation of the Ε-3314 alternator
  • Tech 10 Min Restoration of Byzantine masonry bridge
  • 1 Min Retaining Design of V-3501 B container
  • Concept 01 17th Kindergarten, in Volos
  • Dsc00084 Structural adequacy of a Steel Structure and a Foundation for the implementation of the new V-3205 container
1 | 2 | 3 | 4 | 5
SHARE
Copyright © 2014 Maraveas | Created by tool