Bridge with precast prestressed beams
Location: Chalkida-Kymi, Euboea
Surface: Total Length: 21.4 m
Supervision: 2008
Client: Ministry of Environment, Physical Planning and Public Works
Surface: Total Length: 21.4 m
Supervision: 2008
Client: Ministry of Environment, Physical Planning and Public Works
The bridge serves the traffic needs of the roadway Chalkida-Lepoura-Kymi, over an existing road.
The bridge has one span of 24.0m total length, the deck width is 12.0m, while the structural system consists of prestressed precast beams.