Χ. ΜΑΡΑΒΕΑΣ ΚΑΙ ΣΥΝΕΡΓΑΤΕΣ Ε.Ε.
  • HOME PAGE
  • ABOUT
  • SERVICES
  • PROJECTS
  • NEWS
  • SITEMAP
  • CONTACT US
  • GR
  • |
  • EN
  • Structural Engineering
    • Tunnels and Cut & Cover
    • Building Projects
    • Industrial
    • Bridges
  • Architectural Design

Industrial

  • 2 Complete structural project for the new Wastewater treatment plant, Hellenic Petroleum
  • 1 Structure L Unit 34, extension of ELPE
  • Pict0192 Min Steel structure supporting 2 Jockey pumps
  • Pict0189 Min New shelter, South-East of SS11 (Motor Oil)
  • T 761 Min Structural adequacy of T-776 tank per ΕΑΚ2000, EC8 & API 650 (floating roof, 88.5 m diameter)
  • T 776 Min Structural adequacy of T-776 tank per ΕΑΚ2000, EC8 & API 650 (fixed roof, 47 m diameter)
  • Img 2040 Structural adequacy and retrofitting Design of Pipe-Racks U-1100 & U-3100
  • Pict0196 Min Structural adequacy of FCC/D steel structure for the implementation of the Ε-3314 alternator
  • 1 Min Retaining Design of V-3501 B container
  • Dsc00084 Structural adequacy of a Steel Structure and a Foundation for the implementation of the new V-3205 container
1 | 2
SHARE
Copyright © 2014 Maraveas | Created by tool