Enippeas Cut & Cover and Bridge
Location: Ποταμός Ενιππέα
Surface: Total Length: 200m (Cut & Cover), 90m (Bridge)
Supervision: 2008
Client: Thessaly Region

The objective of this project is the preliminary design of the Enippeas Bridge as well as the Cut & Cover for the Sykeona detour. Analytical research of alternative solutions is followed aiming to the most dominant ones (two alternatives for the Bridge and two for the Cut & Cover) that are designed at the level defined in the Ministerial decision for the content of the Preliminary Design. Finally, the best solutions are selected, based on the design and the total cost.