Chios Pre-stressed Road Bridge
Location: Chios
Surface: Total Length: 90 m
Supervision: 2004
Client: Prefecture of Chios
Surface: Total Length: 90 m
Supervision: 2004
Client: Prefecture of Chios
The bridge is part of the Chios-Mestoi road as an overpass of the Chios-Karfas road.
The total width of the deck is 11.15m, consisting of three spans of lengths 20+46+20m, while the piers’ height is 12m.
The bridge structural system is comprised of a pre-stressed two-box-girder deck with external cantilever beams, supported on solid piers, which are founded on a superficial foundation.
The bridge is constructed through conventional formwork.